Construction worker attendance sheet: free template.

By the MjengoKit team. Updated 7 November 2026. 5 min read.

A construction attendance sheet, sometimes called a muster roll, records which workers were on site each day, for how long and at what rate, so that wages can be calculated and checked. Download the free weekly sheet below. It totals days, overtime and gross pay for each worker in Kenya shillings.

Construction worker attendance sheet (Excel)A weekly muster roll for up to 40 workers. Days, overtime and gross pay calculate automatically.
Download free

What the template includes

  • Project, site, week starting and supervisor at the top.
  • One row per worker: name, ID number, trade, M-Pesa number and day rate.
  • A column for each day of the week. Enter 1 for a full day and 0.5 for a half day.
  • Overtime hours and an overtime rate per hour.
  • Days worked and gross pay, calculated for each worker, with totals for the crew.
  • Signature boxes for the supervisor, the site engineer who checked it and the approver.

The figures in the template are examples. Overwrite them with your own rates and workers.

How to use it

  1. Fill in the project, site, week and supervisor.
  2. List the workers from your worker register. Only registered workers go on the sheet.
  3. Mark attendance at the start and end of each day.
  4. Record overtime hours on the day they were worked.
  5. At the end of the week, check the totals, then sign.
  6. Send the signed sheet with the casual labour payment form for approval.

Rules for supervisors

  • Mark the sheet every day, on site. Never fill a week from memory.
  • Leave no blank rows between names, so names cannot be added later.
  • Correct mistakes with a single line and your initials, not correction fluid.
  • Expect a surprise headcount at least once a week.
  • Keep a copy of every signed sheet.

From attendance to payment

The attendance sheet is the evidence behind the payroll. Days and overtime go onto the payment form, someone other than the supervisor approves it, and workers are paid to their own M-Pesa numbers. Rates and timing of wages are subject to the law: section 18 of the Employment Act says a casual employee's wages are due at the end of the day, and many sites pay weekly, so ask your adviser how this applies to your arrangement. Our guide to paying casual construction workers in Kenya explains wage rates, deductions and when casual work converts to a longer contract.

When to move to digital attendance

Paper works for one crew. It becomes hard to check when you have several sites, workers moving between them, or a payroll paid by M-Pesa. That is when clock-in and clock-out on a phone, tied to the payroll, saves time and closes gaps. See construction payroll software, and our guide to spotting ghost workers. For the weekly checks that stop wages leaking, see labour and casual wages leakage.

See it working on your own numbers

Bring a week of attendance sheets. We will show you the same crew clocking in and getting paid in MjengoKit.

Book a 20-minute demo
FAQs

Frequently asked questions

What is a muster roll?

A list of workers with their attendance for each day, used to calculate and check wages. It is another name for a site attendance sheet.

How do I record half days?

Enter 0.5 for that day. The sheet adds full and half days together into days worked.

How should overtime be calculated?

Record overtime hours on the day they were worked and apply the rate in your terms of engagement, which must respect the law. Our casual workers guide covers the legal points.

Can I use the sheet in Google Sheets?

Yes. Upload the file to Google Drive and open it with Google Sheets. The formulas are standard.

Is the attendance sheet free?

Yes. It is free to download and use, with no sign-up.