Construction requisition form: free template and how to use it.
A construction requisition form is a written request to spend project money on materials, labour or a site expense. It records what is needed, for which project, at what cost, who is asking and who approved it. Download the free Excel form below, print it or fill it in on a laptop, and use it on your next purchase.
What is a requisition in construction?
A requisition is the step before money or materials are committed. Someone on site says what the job needs, and someone with authority agrees before anything is bought. It is an internal document: your suppliers never need to see it.
Many Kenyan contractors already use some version of this, whether a duplicate book, a WhatsApp message or a call to the director. The problem is rarely the idea. It is that the request can't be found later, so nobody can connect the money that left to the reason it left.
Requisition, LPO and invoice: what is the difference?
| Document | Who raises it | Goes to | What it does |
|---|---|---|---|
| Requisition | Site team | Your approvers | Asks permission to spend |
| LPO | Procurement or office | The supplier | Places the order |
| Delivery note | The supplier | Your site | Records what arrived |
| Invoice | The supplier | Your finance team | Asks for payment |
If you only keep one of these from the start of the chain, keep the requisition. It is the only one that records why you decided to spend.
What should a site requisition form include?
- Requisition number and date, so that it can be found and referred to later.
- Project and site. Without this, costs can't be split between jobs.
- Type of cost: materials, casual labour, subcontractor or overheads.
- Items, units, quantities and unit rates, with a calculated total.
- Budget line or cost item it should be charged to.
- Reason and date needed, so an approver can judge urgency.
- Suggested supplier and, for larger purchases, the quotes you compared.
- Requested by, and approved by at each level, with names and dates.
Who should sign a construction requisition?
At minimum, two people: the one asking and a different one approving. Many contractors add a third level for larger amounts. Whoever signs last should not also be the person who pays. Separating asking, approving and paying is the simplest protection you have against unauthorised spending.
The table below shows one common arrangement. The amounts are illustrative, so set limits that suit your company and project sizes.
| Request value | Level 1 | Level 2 |
|---|---|---|
| Under KES 50,000 | Site engineer | Not needed |
| KES 50,000 to 500,000 | Project manager | Finance manager |
| Over KES 500,000 | Project manager | Director |
A filled-in example
This is the kind of entry the form is designed for. The project and figures are illustrative.
| Item | Unit | Qty | Rate (KES) | Amount (KES) |
|---|---|---|---|---|
| Cement, 42.5N | 50 kg bag | 200 | 790 | 158,000 |
| Y12 steel | Tonne | 1.5 | 130,000 | 195,000 |
| Binding wire | Roll | 10 | 1,800 | 18,000 |
| Total | 371,000 |
Five mistakes that make requisitions useless
- Raising them after the purchase. That is a record, not a control.
- Leaving out the project. You will not be able to split the cost later.
- Vague items such as "materials for slab". Nobody can check that against a budget.
- The same person asking and approving. It looks like a control, but it isn't one.
- Filing them away. A requisition only helps if someone compares it with the budget and the payment.
When a paper form stops being enough
A form works well for one or two sites. It becomes hard when requests come from several sites, approvers travel, or you need totals by project. At that point the form is not the bottleneck. Moving the paper and adding up the totals are.
That is what construction requisition software is for: the same fields, sent to the right approver automatically, and linked to the LPO and payment. You can see how the whole chain fits together in our guide to managing construction payments.
Bring your current requisition book. We will show you how the same requests work in MjengoKit.